SG: Road Diversions cause massive jam on MCE

SG: Road Diversions cause massive jam on MCE

With the MCE opened on Sunday, motorists were looking forward to a smooth commute to and from work. However, that was what they didn’t get, for there where huge jams on both sides of the MCE. Certain portions of the ECP have been closed and redirected as a result of the new expressway opening.. This means new slip roads and diversions to further add to the confusion and jam. Not only that, segments of the new slip roads are not able to cope with the high traffic flow; sharp turns out from ECP and narrowing of lanes all contribute to bottlenecks that eventually led to a jam. Once motorists got onto the expressway, the situation wasn’t any better, for most found themselves stuck in a 1 hour jam on the road.  Of course, one can’t push all the blame on the engineers of the road, for the expressway is new and it is natural for people to get lost in an attempt to familiarise themselves with the flow of the roads. Also, ongoing construction in various sections also mean that traffic will have to be slowed down in those areas.

OneShift Editorial Team
OneShift Editorial Team
31 Dec 2013

Credits:

Local News
get quote bg
Sell your car at the highest price in Singapore
  • pros
    Convenient and Hassle-Free
  • pros
    Consumer Protection
  • pros

    Transparent Process
    With No Obligation

Other Articles
Explore moreright arrow
Audi Singapore Will Launch These Cars in 2025
These New BMW And MINI Cars Will Arrive In Singapore in 2025
COE Premiums Rise In Most Categories In Final COE Bidding Exercise of 2024